Future Friday!

Future Friday: Florence Lighting Phase 2

Florence Lighting Phase two is under way. During this project we are removing and replacing taxiway lighting along with the designated connectors, runway 9-27 reils, PAPI’s, and distance remaining signage. This project will also include replacement of the existing electrical vault and wind cone/segmented circle.

In this picture is a trench in which conduits and cans were placed for lighting.