Riffle Range Road Improvement

We installed a 4000 amp 3 phase 480 voltage switch gear capable of paralleling up to 2 power company feeds and 3 generators. It will automatically bring the generators online in the event of an outage. The parallel effect of the generators is to increase capability and work with MR systems and SCADA. The capability will add more of a power load to become available to maintain critical plant operation in the event of a loss of utility.